Sunrak / Structural study

Solar structural study.

Turn your idea into a project ready for manufacture. Calculations, dimensioned drawings and a bill of materials, tailored to your ground, your modules and local conditions.

  • You own the project drawings
  • No obligation to buy hardware
  • Study fee credited subject to conditions
Choose my study
What your study prepares

Your structure, piece by piece.

The study defines every part before fabrication. This is the assembly sequence of a two-car carport drawn by our engineering team.

Preparing the 3D view…
01
Sunrak drawings Anchors

Footings and base plates set out to the study’s foundation principle.

Demonstration view. Your structure is sized for your site, your modules and your loads.

Structural study before supply

The right study for your project.

Three project scales. The same technical foundation in every option.

Residential photovoltaic carport for one vehicle Residential

Compact

Up to 12 kWp

Residential carport, small roof or simple ground-mount structure.

€207.50excl. tax
One-time payment

€249 Including 20% VAT in France; applicable tax for other countries is calculated at checkout.

  • Site-specific calculations
  • Dimensioned drawings and parts list
  • One correction round included
Order the study €207.50 excl. tax credited against your structure
Secure Stripe payment · VAT calculated at checkoutBefore paying: budget, timing and scopePayment opens in a new tab
Unsure which option fits?

Capacity guides your choice. For unusual projects, complex small structures or over 100 kWp, contact us before paying.

Let’s discuss your project

Drawings that become a structure.

For this photovoltaic canopy, Sunrak designed and developed the structural drawings, then supplied all the materials.

Assembly was carried out by an independent contractor chosen directly by the client.

Meet our engineering team

Before paying, is your project ready?

You are buying a structural study, not a complete photovoltaic installation.

01Your hardware budget
Check the indicative carport price ranges before committing. For other structures, ask for budget guidance. The exact hardware quotation follows the drawings.
02Your starting information
Site address, dimensions, module references and photographs of the ground or roof. Missing information? Check with us before paying.
03Timing and file formats
The schedule is confirmed after the complete brief is reviewed. Delivery formats are agreed with you; tell us before paying if you need editable DWG or DXF files.
04A defined scope
Capacity is a guide, not the only criterion. If your project falls outside the package, we agree the next steps before additional work. No extra charge without your agreement.
01 / You own the project drawings

Your drawings. Your decision.

You are commissioning a standalone design service. Once fully paid, the project-specific drawings are yours, even if you later choose another supplier.

See conditions
02 / Study fee credited subject to conditions

Your study counts towards the next step.

Then order your structure from Sunrak: 100% of the net study fee can be credited against the hardware.

Within 90 days · Same site and scope · Net hardware value ≥ 5 × net study fee

See conditions

100% of the net study fee is credited against your structure order when placed within 90 days for the same site and scope, provided the net hardware value is at least five times the study fee. This is a commercial credit and cannot be paid out in cash.

See conditions
Every study includes

A dossier to understand the structural choices, identify the parts and prepare for assembly.

After full payment, the rights to the project-specific drawings are assigned to you. They remain valid only for the assessed site, dimensions, loads and references. Any change to a section, fixing, module or foundation must be revalidated.

  1. 01

    Applicable design assumptions and wind/snow checks

  2. 02

    Dimensioned general arrangement and layout drawings

  3. 03

    Foundation or anchoring principle based on supplied data

  4. 04

    Bill of materials and assembly instructions

  5. 05

    One correction round within the original scope

From the first drawing to the hardware order.

  1. 01

    Choose and pay for the study

    Pay for the option that matches your project on Stripe.

  2. 02

    Complete the technical brief

    After payment, send the site address, dimensions, module references and your documents.

  3. 03

    Receive calculations and drawings

    Our engineering team checks payment and project data before calculations begin. One correction round within the initial scope is included.

  4. 04

    Then approve the hardware quotation

    We quote the hardware specified in the drawings. You then decide whether to place an order.

Before you begin.

What information should I prepare?

The exact site address, required dimensions, capacity and module references, ground or roof details, constraints and any available photographs or drawings. Complete the technical brief after payment.

Does the price include hardware or installation?

No. It covers the structural study and its deliverables. The hardware is quoted separately afterwards. Installation is not included in this service.

What if I do not buy the hardware from Sunrak?

You retain the project-specific drawings after full payment. They apply only to the assessed site and specifications; changes to sections, fixings, modules or foundations must be revalidated.

When does the study begin?

Calculations begin after payment is checked and a complete brief is received. If information is missing, our engineering team will contact you.

Over 100 kWp or an unusual scope?Send us the project