Steel buildings · Steel frame kits

Steel buildings designed to your site, supplied as a steel frame kit.

Storage building, workshop or open-sided shelter: Sunrak designs the portal frame to your dimensions, mono-pitch or duo-pitch, open or fully clad. You receive a free quote with a layout drawing, then a steel building kit delivered with assembly instructions.

  • Free quote, no obligation
  • Layout drawing to your dimensions
  • Drawings, sketches and photos welcome
Agricultural steel buildings →

Free, no obligation

Describe your building, get a drawing and a price.

No payment, no commitment. Give us the dimensions, use and doors and attach site photos: the layout drawing will be right first time more often.

Step 1 of 3 · Your project

Your project
Use

m

m

m

Under 2 minutes

Mono-pitch steel building clad in anthracite steel sheet with a sectional door
Clad mono-pitch steel building with sectional door
What we design

Six decisions that make a steel building.

Two buildings with the same footprint can differ widely in cost and behaviour. These six points are fixed on the layout drawing before we price anything.

01

Portal frames and bay spacing

The structure is a series of portal frames (two columns and a rafter) tied together by purlins and bracing. Bay spacing follows the building length, the door positions and the roof load.

02

Mono-pitch or duo-pitch

A mono-pitch building can lean against an existing wall or stand alone, and drains to one side. A duo-pitch building spans a wider floor without internal columns, within the span the design allows.

03

Eaves height

It follows from the tallest machine or stack you need to house and from the door height. The taller the building, the more wind it takes.

04

Cladding and roofing

Single-skin profiled sheet, insulated panels, rooflights for daylight, or open-sided on one or more elevations: the choice depends on what the building protects.

05

Openings

Sectional doors, sliding doors, personnel doors, open bays: their sizes are fixed before the design, because a large opening changes how the frame is braced against wind.

06

Snow and wind

Snow and wind loads are derived from Eurocode 1 (BS EN 1991-1-3 and BS EN 1991-1-4) and the UK National Annex, using the site location, altitude and exposure. No single value suits every site.

Configurations

Which steel frame building for which use?

The right building is usually the simplest one that does the job. These are the configurations we are asked for most.

ConfigurationTypical usesWorth knowing
Lean-to mono-pitchMachinery store or covered storage against an existing buildingTell us whether the existing wall can take bearings; otherwise the frame stands on its own columns.
Free-standing mono-pitchOpen shelter, log store, simple farm buildingA single roof slope that can face south for a future solar roof.
Duo-pitchStorage building, workshop, vehicle garageWider clear span; rainwater drains to both sides of the ridge.
Open-sidedHay, straw, machinery, firewoodWind gets under the roof and the design allows for it.
Fully cladSecure storage, workshop, plant roomDoors, ventilation, daylight and insulation are planned from the first drawing.

Give us the length, width and eaves height you have in mind. If you are unsure between two options, describe what the building will hold: the layout drawing will suggest the simpler one.

Steel building frame under construction: steel portal frames, purlins and bracing before cladding
Portal frames and purlins before cladding

A steel building kit, marked piece by piece.

Columns, rafters and purlins are fabricated in the factory, marked and delivered with the bolts and assembly instructions keyed to the layout drawing. Erection needs lifting equipment and a contractor used to structural steelwork. We do not erect buildings in the UK: installation is offered in France only.

Options

Cladding, doors, daylight, solar: all settled on the drawing.

Walls

Cladding

Profiled steel sheet in your chosen colour, part cladding at the top of the walls for a semi-open building, or insulated panels for a workshop. Cladding changes the wind loads, so it is decided before the design.

Access

Doors

Sectional, sliding or personnel doors: tell us the width and height of the vehicles or machines that need to pass.

Daylight

Rooflights

A few translucent sheets in the roof or walls bring daylight into a store.

Rainwater

Gutters and downpipes

Gutters and downpipes sized for the roof area. Connection to the drains or a tank is down to you.

Solar

Solar-ready roof

If panels are planned, the weight of the modules and rails goes into the frame design from the start. Solar structures are where we started: solar canopies and solar carports.

Inside

Mezzanine and racking

A mezzanine floor or cantilever racking can be designed together with the building.

Foundations

Know your ground before the concrete pads.

A steel building puts vertical loads into the ground, but also horizontal and uplift forces from wind. Concrete pad foundations under the columns take them, sometimes tied by ground beams, or a slab does.

The layout drawing gives the column positions and the base reactions. Pad sizes then depend on the ground, which a site investigation establishes. Unless the quote says otherwise, site investigation, groundworks, pads and slab are the client’s responsibility.

Planning and Building Regulations

Planning permission and Building Regulations are two separate consents.

Planning permission. Under the Town and Country Planning Act 1990, planning permission is required for the development of land, and development includes building operations. Some projects fall under permitted development rights instead. In England, the Planning Portal explains that a new industrial building or warehouse can be permitted development only within the curtilage of an existing one, under strict limits on floor space, height and distance from the boundary. Farm buildings have their own rights: see our page on agricultural steel buildings. Scotland, Wales and Northern Ireland have their own rules.

Building Regulations. The Planning Portal states that the Building Regulations will generally apply to new buildings, extensions and alterations. Your local building control body tells you what it needs to see.

Our dimensioned drawings can serve as the technical basis of your application.

Before you order
Speak to your local planning authority and building control body with the site address, footprint and height. Order the building once you have the consents you need.

Sources : legislation.gov.uk, Town and Country Planning Act 1990, section 55 ; legislation.gov.uk, Town and Country Planning Act 1990, section 57 ; Planning Portal, warehouses and industrial buildings ; Planning Portal, warehouses and industrial buildings: Building Regulations

Scope

What Sunrak supplies, and what it does not.

Supplied by Sunrak
  • The free quote, with a dimensioned layout drawing based on your measurements.
  • The base reactions shown on the layout drawing, for foundation design.
  • The made-to-measure frame with the roofing, cladding, doors and accessories you order, supplied as a kit with assembly instructions.
  • The manufacturer’s certificates, sent with the quote. For structural steel components, EN 1090 is the standard to ask about.
Not supplied
  • Planning and Building Regulations applications.
  • Site investigation, groundworks, pads and slab, unless shown on the quote.
  • Electrics, lighting and drainage connections.
  • Solar modules, inverter and grid connection.
  • Erection: we do not install in the UK. Your chosen contractor erects the building.
How it works

From your dimensions to an erected building.

1
Enquiry

Dimensions and use

Length, width, eaves height, roof pitch, doors and site photos: the form takes a few minutes.

2
Free quote

Layout drawing and price

Frame spacing, openings, base reactions and the price of the building and options.

3
Consents

Your applications

The dimensioned drawing gives your architect or agent the technical basis for planning and building control.

4
Fabrication

Made to measure

Factory fabrication. Lead time for fabrication and delivery is confirmed on the quote.

5
Delivery

Kit with instructions

Delivered ready to erect, with assembly instructions. Erection by the contractor of your choice.

Steel buildings FAQ

Questions to ask before buying a steel building.

Do I need planning permission for a steel building?
Usually, yes: planning permission is required for development, which includes building operations. Some cases are permitted development, such as limited new buildings on an existing industrial site in England or certain farm buildings. Check with your local planning authority before you order.
Do steel buildings need Building Regulations approval?
The Planning Portal says the Building Regulations generally apply to new buildings. Some agricultural buildings are exempt under conditions: see our agricultural steel buildings page. Your building control body confirms what applies to your project.
How much do steel building kits cost?
Price depends mainly on floor area, clear span, eaves height, snow and wind loads at the site, cladding and the number of doors. We do not publish prices per square metre: the free quote gives the price of your configuration, with options listed separately.
Mono-pitch or duo-pitch?
A mono-pitch suits a lean-to or a building of moderate width, and a solar roof facing one way. A duo-pitch spans wider without internal columns. Describe your use and site, and the layout drawing will suggest the simplest option.
Who builds the foundations?
Unless the quote says otherwise, site investigation, groundworks, pads and slab are your responsibility. The layout drawing gives the column positions and base reactions your engineer or groundworker needs.
Does Sunrak erect the building in the UK?
No, we do not install in the UK. The steel building kit arrives with assembly instructions, and a steel erector of your choice puts it up.
Can I put solar panels on the roof?
Yes, if you plan for it at order stage: the weight of modules and rails goes into the frame design, and pitch and orientation are chosen to suit. Modules, inverter and grid connection are not supplied.